| The
Conrol of Asbestos (2006) regulations regulations came into force
in the UK in 2006, making it the responsibility of the Duty
Holder of commercial premises to manage any asbestos
that may be on the premises.
This will
mean that a formal document or Asbestos Register needs to be
kept so that any staff or other personnel that visit the building
are not exposed to any fibres.
To identify
the presence of any asbestos containing materials a full Asbestos
Survey needs to be undertaken.
This will
identify the extent and condition of any asbestos containing
materials found and make recommendations regarding any repairs
or removal and should be undertaken by a qualified Asbestos
Surveyor.
The aim
of the survey is to provide necessary information to implement
a Management Strategy of any Asbestos Containing Materials (ACM's).

Types
of Survey
There are
three types of survey referred to in The MDHS. (Method of Determining
Hazardous Substances).
Type
1
Location and Assessment Survey (Presumptive Survey)
|
Type
2
Standard Sampling, Identification and Assessment Survey
(Sampling Survey)
|
Type
3
Full Access Sampling and Identification Survey
(Pre-Demolition/Major Refurbishment Surveys) |
Costs
|